
Photo: DPPed, CC BY-SA 3.0, via Wikimedia Commons
Short answer: New cubicles for Phoenix offices take 4 to 6 weeks from an approved order and are built to your station size, panel height and finish. Office Station supplies new workstations, including its own OS2 panel system, and can quote the same layout new, remanufactured (usually 7 to 14 days) or liquidation grade (in stock, installed in as little as 72 hours). Buy new when the finish, size or brand standard matters more than speed, and mix grades when it does not. Every project is quoted individually, with a free space plan.
- When new cubicles beat pre-owned
- The OS2 workstation system
- The 4 to 6 week timeline, step by step
- Mixing new with pre-owned
- What to decide before you order
- Delivering new cubicles in the Valley
When new cubicles beat pre-owned
Pre-owned costs well below new, and for many Phoenix offices that settles it. The office cubicles in Phoenix page covers the full range of grades. This page is for the cases where new is the better buy, and there are more of them than people assume.
- An exact finish or brand standard. A corporate tenant with a specified fabric, laminate and paint palette will rarely find forty matched pre-owned stations in those exact colors. New is ordered to the specification.
- A size or height that is not in stock. Pre-owned inventory is whatever came off the last corporate floor. If your plan calls for 8 by 8 foot stations at 53 inches with glass stackers, new removes the hunt.
- A system you will grow into. Adding stations to a new system later is simpler when the line is still in production and the finishes are still available.
- A first impression for clients. Client-facing floors in Camelback Corridor and Scottsdale suites often justify new or remanufactured stations, even when the back office is pre-owned.
- A lead time you can absorb. If the build-out runs longer than six weeks anyway, new costs you no time.
New loses when the date is tight. If your lease starts in three weeks, new will not make it, and the answer is pre-owned for now or a mixed plan.
| Question | New | Remanufactured | Liquidation grade |
|---|---|---|---|
| Lead time | 4 to 6 weeks | Usually 7 to 14 days | In stock, installed in as little as 72 hours |
| Finish choice | Full finish library | New fabric, paint and laminate on a rebuilt frame | As it came off the floor |
| Station size and height | Specified to your plan | Limited to frames in stock | Limited to matched stock |
| Condition | New | Rebuilt, refreshed surfaces | Graded A like new, B very good or C good |
| Warranty | Terms of the line ordered | Manufacturer warranty generally does not transfer | Manufacturer warranty generally does not transfer |
| Best fit | Brand standards, long-term growth | Consistent look on a shorter timeline | Fast openings, operations rows |
For a deeper comparison, read used vs remanufactured vs new cubicles. For rebuilt stations, see remanufactured cubicles in Phoenix.
The OS2 workstation system
OS2 is Office Station's own new panel workstation line, and it is the default when a Phoenix office asks for new cubicles. It is a fabric panel system with segmented stackers, so one frame can be built low for collaboration or tall for privacy.
- Panels from 12 to 60 inches wide and 32 to 85 inches high.
- Stackers in glass (14 or 18 inch) for daylight, fabric for privacy and dry-erase marker board for teams that plan at the desk.
- Power through a 4-circuit base system, so stations can be split across circuits for monitors, task lights and chargers.
- Typical layouts to start from: 30 by 60 inch desking, 6 by 6 foot stations and 8 by 8 foot stations. Every count, size and height can be changed.
- Finishes from a library of 375 fabrics, laminates, paints, glass and PET, with physical samples sent with your quote.
Full specifications, layouts and the finish library are on the OS2 workstation system page. Other new lines, including the OS Power Wall, OS Summit and OS Meridian desks and OS Casegoods, are on new office furniture. If you want open desking rather than panels, see benching desks in Phoenix.
The 4 to 6 week timeline, step by step
The 4 to 6 weeks runs from an approved order, not from your first email, so the planning work in front of it matters. Here is how a new cubicle project usually moves.
- Plan. Send headcount, a floor plan or test fit, and your move-in date. The free office space plan shows station count, aisle widths and where power enters each run.
- Specify. Pick station size, panel height, stacker pattern and finishes. Samples arrive with the quote.
- Approve. The written quote lists the furniture, electrical, delivery and installation as separate lines. The clock starts at approval.
- Prepare the building. While the order is in production, confirm the certificate of insurance, dock or liftgate access, freight elevator time and whether power comes from walls, floor monuments or ceiling poles.
- Deliver and install. Crews install to the plan. A licensed electrician makes the hardwired power connection afterward, quoted as its own line. See cubicle installation in Phoenix.
Two things most often stretch the schedule: finish changes after approval, and a building that is not ready on install day. Lock finishes before you sign, and ask your general contractor when the suite will have carpet, ceiling and cooling in place.
Mixing new with pre-owned
Mixing grades is the most practical answer for many Valley offices. It lets you put new money where it is seen and save where it is not.
Split by zone
The common pattern is new or remanufactured stations on the client-facing floor and liquidation-grade stations in operations, training and overflow rows. Each zone is its own run in the space plan.
Split by date
If the team moves in before new furniture can arrive, liquidation-grade stations can be installed in as little as 72 hours and redeployed to another area once the new system lands. Plan both installs at the start so the building only has to be booked twice, not three times.
Split by component
Seating, storage and private office desks can come from the pre-owned side while the workstations are new. Office chairs in Phoenix covers 16 designer task chair models in remanufactured and pre-owned grades.
One caution: panel systems from different manufacturers generally do not connect panel to panel. A mixed plan keeps each system in its own run, joined by aisles or a freestanding element rather than shared panels.
What to decide before you order
| Decision | Common Phoenix choices | Why it matters |
|---|---|---|
| Station size | 6 by 6 for most staff, 8 by 8 for managers, 30 by 60 desking for touchdown | Sets how many stations fit the floor |
| Panel height | 39 or 47 inch for collaboration, 53 inch for focus, 67 inch for privacy | Taller panels use more material and block more daylight |
| Stackers | Glass on the window side, fabric on the aisle side | Keeps daylight moving through deep floor plates |
| Power | Base power with wall, floor or ceiling feed | Decides what the electrician needs to do |
| Storage | Pedestals under the worksurface, laterals at the aisle | Affects station depth and aisle clearance |
Questions worth asking on any new cubicle quote
- Is the finish in production? Ask whether the fabric, laminate and paint you chose are standard or special-order, because special finishes can affect the schedule and future add-ons.
- What is included at each station? Confirm worksurfaces, pedestals, overhead storage, keyboard trays and monitor arms line by line, so nothing is assumed.
- How is power handled? The quote should say how many circuits each run carries and where it connects to the building, with the electrician on a separate line.
- What happens if headcount changes? Ask how stations can be added later in the same finish, and how long an add-on order takes.
- Who removes packaging? New systems arrive boxed, and the quote should state who takes the cardboard and wrap away.
Ask the same questions of the pre-owned options on the quote, and you will see clearly what the extra lead time for new buys you. If the plan includes sit-stand desks, see standing desks in Phoenix.
The cubicle size guide covers station sizes in detail, and the cubicle configurations page shows single, inline, cluster and bullpen layouts.
Delivering new cubicles in the Valley
New cubicles ship as boxed components, so they need more staging space and more packaging removal than pre-owned runs. Downtown and Midtown towers book docks and freight elevators by the hour, so a large new order is often split across two or three building windows. Business-park suites in Chandler, Tempe and the Scottsdale Airpark usually unload by liftgate from the lot.
From May through September, deliveries are booked for early morning so boxed panels and worksurfaces are not left in a hot trailer, and monsoon storms in July and August are another reason to finish unloading before the afternoon. For the full Valley picture across every category, see office furniture in Phoenix.
Planning new cubicles for a Phoenix office? Space planning is free. Email hello@officestation.com with your headcount, floor plan and move-in date, or request a quote, and the plan comes back with new and pre-owned options side by side.
Frequently asked questions
Where can I buy new office cubicles in Phoenix?
Office Station supplies new panel workstations to Phoenix and Valley offices, including its own OS2 system, alongside pre-owned and remanufactured cubicles. You send a headcount, floor plan and move-in date, and you receive a free space plan and a written quote with furniture, electrical, delivery and installation on separate lines. Every project is quoted individually.
How long do new cubicles take to arrive in Phoenix?
New cubicles take 4 to 6 weeks from an approved order. Remanufactured cubicles usually take 7 to 14 days, and in-stock liquidation-grade cubicles can be installed in as little as 72 hours. If your lease or move-in date is closer than six weeks, ask for a mixed or pre-owned option on the same layout.
When should I buy new cubicles instead of used?
New makes sense when you need an exact finish or brand standard, a station size or panel height that pre-owned stock does not have in your quantity, glass or marker board stackers in a specific pattern, or a system you plan to grow into for years. Used or remanufactured makes sense when the date is tight or the budget leads.
Can I mix new cubicles with used cubicles in one office?
Yes, and many Phoenix offices do. The common split is new or remanufactured stations on client-facing floors and liquidation-grade stations in operations, training or overflow rows. Panel systems from different manufacturers usually do not connect to each other, so mixed grades are planned as separate runs or zones in the space plan rather than joined panel to panel.
What sizes and heights do new OS2 cubicles come in?
OS2 panels range from 12 to 60 inches wide and 32 to 85 inches high, built up with fabric, glass or marker board stackers. Typical layouts start from 30 by 60 inch desking, 6 by 6 and 8 by 8 foot stations, and every size and height can be changed to fit your floor. Base power is a 4-circuit system.
Do new cubicles come with a manufacturer warranty?
New furniture carries the warranty terms of the line you order, and your quote states which line each item comes from. Pre-owned cubicles are different: manufacturer warranties generally do not transfer, so pre-owned lines carry a condition grade instead. Office Station is an independent reseller, not an authorized dealer of any third-party manufacturer.
