Buying checklist

Cubicle Buying Checklist for Phoenix Offices

Every measurement, building question and quote line to settle before you order cubicles for a Phoenix-area office, in the order you will need them.

9 minute read  ·  Updated September 2026

Short answer: Before you buy cubicles for a Phoenix office, settle six things in order: headcount by role, exact room measurements including columns and windows, where power and data enter the space, panel heights, your building's delivery and installation rules, and clear accessible routes of at least 36 inches under the 2010 ADA Standards. Then compare quotes line by line, not by the bottom number. A free space plan covers most of this list for you.

This checklist is for the cubicles themselves. If you are moving a whole office, the Phoenix office move-in furniture checklist covers every room. For product options and grades, start at office cubicles in Phoenix.

Start with headcount and roles

The number of stations is not always the number of employees. Before anyone measures, write down three counts: people who sit at a desk every day, hybrid staff and their busiest day in the office, and growth you expect during the lease. Then group people by the kind of work they do.

  • Phone-heavy roles such as customer service, collections and dispatch need taller panels and often a compact footprint.
  • Focused desk work such as accounting, underwriting and engineering usually suits a standard station with storage.
  • Managers and leads may need a larger station with a guest chair instead of a private office.
  • Hybrid and visiting staff often fit better at benching or smaller shared stations.

This split decides station size, panel height and how much storage each person needs, which is most of the cubicle order.

What to measure in the suite

A landlord's floor plan is a good start, but test fits and marketing plans are often drawn before the build-out is final. Measure the real space or confirm the plan against it. Bring a tape measure, a phone and a printed plan to mark up.

  • The length of every wall of the open area, corner to corner.
  • Door openings: width, which way they swing and how far the swing reaches into the room.
  • Ceiling height, and any soffits or bulkheads that drop lower.
  • Every wall outlet, floor box, data jack and power pole location, measured from two walls.
  • Thermostats, light switches and fire alarm devices that must stay reachable.
  • The path from the loading area to the suite: doors, hallways, the elevator cab and any tight corners.

Take a photo of each wall with the tape measure visible. It costs a few minutes and saves a second site visit. For the station dimensions you are fitting into the room, see the cubicle size guide.

Columns, windows and fixed features

Columns are where cubicle plans most often go wrong. Measure each column's size and its distance to the two nearest walls or window lines. A column that lands in the middle of a station can sometimes be wrapped by a panel or used as the end of a run, but it can also cost a full station if the plan ignores it. Many Midtown and Camelback Corridor towers have regular column grids, while older low-rise buildings in Tempe, Mesa and the Scottsdale Airpark can have irregular ones after past remodels.

Windows matter for two reasons. First, the sill height: a panel taller than the sill blocks daylight and the view for everyone behind it. Second, heat: in a Phoenix summer, stations right against west or south glass can run warm in the afternoon even with blinds. Lower panels along the window line and taller panels on the interior spine are a common answer.

Also mark anything that cannot move: sinks and kitchenettes, electrical and data closets, fire extinguisher cabinets, sprinkler riser rooms and exit doors. Stations cannot block any of them.

Power and data

Decide early which stations need power at the worksurface and how the system will connect to the building. There are three usual feeds:

  • Base feed from a wall. Simplest when runs start at a wall with circuits behind it.
  • Floor box or core drill. Common for runs in the middle of a floor, but it needs the landlord's approval and sometimes a scan of the slab.
  • Ceiling power pole. Useful when the floor cannot be cut, though the poles are visible.

Powered panels need a licensed electrician to make the final connection after installation, and that is quoted as its own line. Ask building management how many circuits serve the open area and whether they are dedicated. Data cabling usually rides in the same panel raceways, so tell your IT vendor the station plan before cable is pulled, and confirm whether the runs need separate raceways for power and data.

Panel heights

Panel height sets privacy, light and how the room feels. Taller panels also use more material, so they affect the quote. These are the four heights Office Station works with:

Panel heightWhat a seated person experiencesTypical use
39 inchesOpen view across the room, desk surface screenedCollaborative teams, benching, short-stay seats
47 inches (low panel)Head and shoulders visible, light passes overOpen teams that still want a defined desk
53 inchesSeated privacy, standing people can see overMost general office work
67 inchesNear-full privacy, blocks most sightlinesPhone-heavy roles, HR, finance

Mixed heights in one station are common, with a tall spine and low aisle side. Glass or acrylic stackers on top of a lower panel add privacy while letting light through. If you only need to add height or replace panels on a system you already own, see cubicle panels in Phoenix.

Phoenix building rules

The building decides when and how cubicles go in. Get these answers from property management before you sign off on a schedule:

  • Certificate of insurance. The exact wording, additional insured names and limits the building requires. Towers in Downtown Phoenix, Midtown and the Camelback Corridor are usually specific.
  • Dock and freight elevator. Whether there is a dock, how far ahead it books, and the elevator cab size. Long panels and worksurfaces must fit the cab.
  • Working hours. Many towers allow installs only on evenings and weekends. Medical office buildings may restrict noise during patient hours.
  • Office parks and HOAs. Many suburban parks in Chandler, Gilbert, Scottsdale and the West Valley have no dock, so trucks unload by liftgate in the lot. Park rules may limit truck parking, staging in the lot or hours of work.
  • Protection. Floor and wall protection, elevator pads and debris removal requirements.
  • Heat. From late spring through September, ask for early morning delivery and have the suite's air conditioning on. The summer heat delivery guide explains why.

Installation crews work to these rules. See cubicle installation in Phoenix for how an install is scheduled.

Accessible routes and aisles

Aisle widths are a code question, not a preference. The figures below come from the 2010 ADA Standards for Accessible Design published on ada.gov. They are minimums. Your architect, landlord or the local building department confirms what your specific space must meet, and fire code may require wider exit paths.

Item2010 ADA Standards figureSection
Clear width of an accessible route36 inches minimum403.5.1
Short reduction in width32 inches minimum for a length of 24 inches maximum403.5.1 exception
Turn around an obstruction under 48 inches wide42 inches approaching the turn, 48 inches at the turn403.5.2
Passing spaces on routes narrower than 60 inchesAt intervals of 200 feet maximum403.5.3
Circular turning space60 inches diameter minimum304.3

Two points are easy to miss. First, clear width is measured from the face of the panel or furniture, not the panel centerline, and chairs and pedestals push into aisles once people are working. Second, section 203.9 says employee work areas must be designed so people with disabilities can approach, enter and exit them, and the Standards allow some clearances on common use circulation paths within employee work areas to be decreased in certain cases. Do not assume an exception applies; ask the person responsible for your permit or code review.

How to compare cubicle quotes

Two quotes for the same headcount can describe very different furniture. Put them side by side and check each line.

Quote itemWhat to look forWhy it matters
Manufacturer and product lineNamed, not "brand-name system"Parts and add-ons must match the system later
Grade and conditionLiquidation grade, remanufactured or new; condition A, B or C for pre-ownedGrade sets both appearance and lead time
Station size and panel heightWidth, depth and height for every station typeA smaller station or lower panel changes the whole plan
Worksurfaces and storageSurface shape, pedestals, overheads, lateral filesStorage is often where quotes quietly differ
FinishesFabric, laminate and paint named, with samples or photosMatched finishes across a run
PowerPowered or non-powered panels, feed typeAffects the electrician line and the floor plan
Delivery, installation, electricalIncluded, separate or missingA missing line is a cost you meet later
Lead timeStated in writing for the exact quantityYour move-in date depends on it
WarrantyWhat is and is not coveredManufacturer warranties generally do not transfer to pre-owned furniture

Office Station is an independent reseller, not an authorized dealer of any manufacturer, so brand names on its quotes identify the original manufacturer only. Every project is quoted individually, with electrical, delivery and professional installation as separate lines. Lead times by grade: liquidation grade in as little as 72 hours when in stock, remanufactured usually 7 to 14 days and new 4 to 6 weeks. The trade-offs are explained in used vs remanufactured vs new cubicles.

The full checklist

  1. Count daily staff, peak hybrid attendance and expected growth.
  2. Group people by work type and choose a station size for each group.
  3. Measure every wall, door, ceiling height and fixed feature, with photos.
  4. Locate and measure every column and window sill.
  5. Map outlets, floor boxes and data jacks, and ask about circuit capacity.
  6. Choose panel heights by role and by window line.
  7. Check how many stations really fit with the cubicle count guide.
  8. Confirm accessible routes of at least 36 inches clear and wider turns where needed.
  9. Get the building's insurance wording, dock and elevator details and working hours.
  10. Choose a grade that fits your move-in date.
  11. Compare quotes line by line, including power, delivery, installation and electrical.
  12. Get the lead time and the final layout in writing before you approve.

Most of this list is handled in a free space plan. Send your floor plan or measurements, headcount and move-in date to hello@officestation.com or through the cubicle quote form, and see office space planning in Phoenix for what the plan includes.

Frequently asked questions

What should I measure before buying cubicles?

Measure each wall of the open area, the distance from every column to the nearest walls, door widths and swing, window sill heights, ceiling height and the location of every wall outlet, floor box and data jack. Note anything fixed, such as a sink, a fire extinguisher cabinet or an electrical panel. A phone photo of each wall with a tape measure in frame helps the space planner catch what a sketch misses.

How wide do aisles between cubicles need to be?

Under the 2010 ADA Standards, an accessible route needs a clear width of at least 36 inches, measured from the face of the panel, not the centerline. Where a route turns around an obstruction narrower than 48 inches, the Standards call for 42 inches approaching the turn and 48 inches at the turn. Many offices plan main aisles wider than the minimum. Your architect or the local building department confirms what your space requires.

Which cubicle panel height should I choose?

Choose by the work. Panels at 39 inches suit collaborative teams and benching, 47 inches (often called low panel) keeps sightlines open while covering a seated person's desk, 53 inches gives seated privacy, and 67 inches gives near-full privacy for phone-heavy roles. Many Phoenix offices mix heights: taller panels on the spine between stations and lower panels on the aisle and window side.

Do powered cubicles need an electrician?

Yes. Powered panels carry the electrical inside the system, but connecting the system to the building power, usually at a wall or floor box through a base feed or a ceiling pole, is work for a licensed electrician after the stations are installed. Office Station quotes electrical as its own line. Ask your building management early whether the suite's circuits can carry the number of stations planned.

How do I compare cubicle quotes from different suppliers?

Line the quotes up item by item. Check that each one names the manufacturer and product line, the station size, panel height, worksurface and storage, the grade and condition, the finish, the quantity, and whether power, delivery, installation and electrical are included or separate. A quote that leaves a line out is not cheaper, only incomplete. Ask for the lead time in writing too.

How long does it take to get cubicles installed in Phoenix?

It depends on the grade. In-stock liquidation-grade cubicles can be installed in as little as 72 hours, depending on quantity and building access. Remanufactured cubicles usually take 7 to 14 days, and new cubicles take 4 to 6 weeks. Building rules matter too, because many Phoenix towers book docks and freight elevators days ahead and limit installs to evenings or weekends.

Rows of office seating
Start here

Ready to furnish the space?

Pre-owned designer furniture, quoted to your project, with in-stock liquidation grade installed in as little as 72 hours.