Space planning

How Many Cubicles Fit in Your Phoenix Office

A step-by-step way to estimate your cubicle count from the square footage on a Phoenix lease, with planning figures for each station size and the things that cost stations in real buildings.

9 minute read  ·  Updated September 2026

Short answer: To estimate how many cubicles fit in a Phoenix office, start from usable square feet, not the rentable figure on the lease, then subtract space for the entry, circulation and support rooms. Divide what remains by a planning figure per station: about 40 to 48 square feet for a 5x5, 50 to 60 for a 6x6, 60 to 75 for a 6x8 and 85 to 100 for an 8x8, including a share of the aisle. Columns, windows and room shape then trim the count, which is why a free space plan is the reliable final answer.

This page answers one question: how many stations will my space hold. For what each station size feels like to work in and which roles suit it, see the cubicle size guide. For a drawn layout of your actual suite, see office space planning in Phoenix.

Usable vs rentable square feet

The square footage on a Phoenix lease or listing is usually rentable square feet. Rentable includes your share of the building's common areas: the lobby, shared corridors, restrooms and similar spaces. Usable square feet is the area inside your suite that you can actually furnish. Buildings measure these under industry standards such as those published by BOMA, and the ratio between them is called the load factor (also called the common area factor or add-on factor).

The conversion is simple: usable square feet equals rentable square feet divided by one plus the load factor. As a worked illustration, a suite listed at 5,750 rentable square feet in a building with a 15 percent load factor has about 5,000 usable square feet (5,750 divided by 1.15). That example is only arithmetic. Load factors differ by building, so ask your landlord or broker for the actual usable figure, or for the load factor, before you count a single cubicle.

Multi-tenant towers tend to have more common area to share than a single-tenant building where you lease a whole floor or the whole building, so the gap between rentable and usable varies a lot across the Valley.

The counting method, step by step

  1. Get usable square feet. From the landlord, a measured floor plan or your own measurements.
  2. Take out fixed rooms. Private offices, conference rooms, break room, copy and storage, server or data closet, restrooms inside the suite.
  3. Take out reception and the entry. Even a small suite needs a landing zone at the door.
  4. Take out primary circulation. The main paths from the entry to exits, rooms and the workstation area.
  5. What remains is the workstation zone. This is the area cubicles actually occupy.
  6. Divide by the planning figure for the station size you want, from the table below.
  7. Adjust for the room. Columns, windows, odd angles and where power enters the space.

Steps one through five are where most estimates go wrong. People divide the full lease number by a station size and arrive at a count the room can never hold.

Station sizes and planning figures

Cubicle sizes are stated as width by depth in feet, measured to panel centerlines. A planning figure adds each station's share of the aisle that serves it. The figures below assume stations placed back to back in pods, two rows sharing a spine, with a 48 inch aisle shared between neighboring pods.

Take a 6x6 pod as the example. Two rows back to back are 12 feet deep. Add a 4 foot aisle and the repeating module is 16 feet deep. Every 6 feet of width holds two stations, one on each side of the spine, so each station uses 48 square feet in theory. Pod ends, walls and columns add real-world loss, which is why the planning figure is a range.

  • 5x5: 10 foot pod plus a 4 foot aisle, about 35 square feet in theory, 40 to 48 in practice. Compact, common for call centers and hybrid seats. The compact cubicles guide covers small footprints.
  • 6x6: about 48 in theory, 50 to 60 in practice. The most common full-time station.
  • 6x8: 16 foot pod plus aisle, about 60 in theory, 60 to 75 in practice. Room for more storage or a second monitor setup.
  • 8x8: about 80 in theory, 85 to 100 in practice. Managers, leads and roles with guest seating.

Density table by station size

These counts apply the planning figures to the workstation zone only, after rooms, reception and main corridors are taken out. They are starting estimates, not a layout.

Station sizeSquare feet per station (planning)Stations per 1,000 sq ft of zoneStations per 2,000 sq ft of zoneStations per 4,000 sq ft of zone
5x540 to 4821 to 2542 to 5083 to 100
6x650 to 6017 to 2033 to 4067 to 80
6x860 to 7513 to 1627 to 3353 to 66
8x885 to 10010 to 1120 to 2340 to 47

For the whole office, a broader rule of thumb helps check the result. Divide usable square feet by headcount. An office built mostly on benching tends to run about 80 to 110 square feet per person, a cubicle-based office about 110 to 175, and an office with many private offices 175 to 250 or more. If your plan comes in well under the range for its type, it is probably too tight. Benching gets more seats from the same zone; see benching desks in Phoenix.

Aisle widths

Aisles are where people try to squeeze in extra stations, and where plans fail inspection. Under the 2010 ADA Standards for Accessible Design, the clear width of an accessible route is 36 inches minimum (section 403.5.1), and a turn around an obstruction narrower than 48 inches needs 42 inches approaching the turn and 48 inches at the turn (section 403.5.2).

Aisle typePlanning widthNotes
Accessible route36 inches clear minimum2010 ADA Standards 403.5.1, measured from panel face
Aisle between pods48 inches is a common planning choiceLets two people pass and leaves room for pulled-out chairs
Main corridor to exitsOften widerSet by fire and building code for your occupancy; confirm locally

Clear means clear. A 36 inch aisle drawn to panel centerlines is narrower in the finished room, and chairs, pedestals and recycling bins push into it once people are working. Your architect, landlord or the local building department confirms the widths your space must meet.

Columns, windows and the building core

Columns. Measure each column and its distance to the nearest walls. A column inside a pod can cost a full station. Good layouts line pods up with the column grid, use a column as the end of a run or wrap it with a panel. Shifting a pod by a foot or two often recovers a seat.

Windows. Windows change panel height more than count. Tall panels along the glass block daylight for the whole floor, so stations along the window line usually get lower panels. In a Phoenix summer, stations against west or south glass can run warm in the afternoon, which some offices handle by placing shared or short-stay seats there.

Core and shape. A floor wrapped around a central elevator and restroom core leaves a ring of space that may be too shallow for back-to-back pods on some sides. L-shaped suites, angled walls and deep window bays all reduce the count compared with a clean rectangle of the same area.

Power. Pods need to reach a power source: a wall, a floor box or a ceiling pole. A run that cannot reach power may need to move, which can change the count.

How Phoenix building types change the count

The Valley has a wide mix of office buildings, and each shape behaves differently in a plan.

  • Towers in Downtown Phoenix, Midtown and the Camelback Corridor. Regular column grids and a central core. Counts are predictable once the grid is mapped, but multi-tenant floors can have a meaningful load factor.
  • Low-rise suburban offices in Tempe, Chandler, Scottsdale and the West Valley. Often one or two stories with suites carved out over the years. Expect irregular columns, mixed window lines and leftover walls from past tenants.
  • Flex and industrial-office space in areas like Deer Valley, the Chandler Price Corridor and along the Loop 101 and Loop 303. Open bays with wide spacing between columns can hold large matched runs, which suits operations and call center teams. Check where power can reach the middle of the floor.
  • Medical office buildings. Exam rooms and corridors take most of the area, so workstations are usually a small pod behind reception.

For grades, sizes and matched runs across the metro, see office cubicles in Phoenix and the layout options on cubicle configurations.

Mistakes that overcount

  • Planning to rentable square feet. The most common error. Always start from usable.
  • Forgetting support rooms. A conference room, break area and copy and storage space are needed in almost every office.
  • Using theoretical figures. The 48 square foot 6x6 only exists in an endless rectangle. Use the planning range.
  • Narrowing aisles to add seats. Two extra stations are not worth a failed inspection or a floor nobody can walk through.
  • Counting employees instead of seats. Hybrid teams may need fewer stations than people; see hybrid office furniture planning.
  • Ignoring the checklist. Columns, power, panel heights and building rules all affect the plan. The cubicle buying checklist for Phoenix offices covers every item.

An estimate gets you close; a drawn plan gets you the real number. Space planning is free: send your floor plan or measurements, headcount by role and move-in date to hello@officestation.com or use the cubicle quote form, and the plan comes back showing exactly how many stations fit, with every project quoted individually.

Frequently asked questions

How many cubicles fit in 1,000 square feet?

It depends on whether the 1,000 square feet is the whole suite or just the workstation area. If 1,000 square feet is set aside only for workstations, planning figures suggest roughly 17 to 20 stations at 6x6, 21 to 25 at 5x5, 13 to 16 at 6x8 and 10 to 11 at 8x8. A whole suite of that size also needs an entry, circulation and support space, so expect fewer.

What is the difference between rentable and usable square feet?

Rentable square feet is what the lease charges for. It includes your share of building common areas such as lobbies, corridors and restrooms. Usable square feet is the space inside your suite that you can actually furnish. The gap is the load factor. Plan cubicles from usable square feet, and ask the landlord or broker for the usable figure or the load factor if the lease shows only rentable.

How much space does one cubicle need, including aisles?

Planning figures for stations placed back to back in pods with a shared 48 inch aisle are about 40 to 48 square feet for a 5x5, 50 to 60 for a 6x6, 60 to 75 for a 6x8 and 85 to 100 for an 8x8. These cover the workstation zone only. Conference rooms, a reception area, break rooms and main corridors are planned separately on top.

How wide should aisles be between cubicles?

An accessible route needs at least 36 inches of clear width under the 2010 ADA Standards, measured from the face of the panels. Many offices use 48 inch aisles between pods so two people can pass and chairs do not block the path, and main corridors to exits often need more under fire code. Your architect or building department confirms the widths your space requires.

Do columns and windows reduce how many cubicles fit?

Often, yes. A column that falls inside a station can cost a full seat unless the layout is shifted or the column is wrapped as the end of a run. Windows affect panel height more than count, because tall panels along glass block daylight. Odd-shaped rooms, deep window walls and a central building core usually reduce the count compared with a simple rectangle.

Can someone tell me exactly how many cubicles fit in my space?

Yes. Office Station provides free space planning. Send a floor plan, a landlord's test fit or measured sketch, your headcount by role and your move-in date, and the plan shows exactly how many stations fit, which sizes, where aisles and power run and how columns are handled. You can then get the same layout quoted in more than one grade.

Rows of office seating
Start here

Ready to furnish the space?

Pre-owned designer furniture, quoted to your project, with in-stock liquidation grade installed in as little as 72 hours.