Procurement guide

How to Write an Office Decommissioning RFP or Scope of Work

A scope that bidders can price the same way: what to include, what to ask for, and how to compare the proposals that come back.

8 minute read
Office team at work

Short answer: a good office decommissioning RFP describes the space, the dates and the inventory, then breaks the work into line items every bidder prices the same way: furniture removal and routing, cabling, fixtures, IT and e-waste, restoration, and the handback. It names the building rules and the documents required at the end. Scopes written that way get proposals you can compare line by line.

Site, dates and contacts

Start with the facts every bidder needs before they can price anything:

  • Building address, floors or suites, and approximate square footage.
  • The date the space must be empty and the date of the handback walkthrough.
  • Whether the space is occupied during the work, and by whom.
  • One contact for questions, and the deadline for questions and for proposals.

Inventory and walkthrough

Bidders price what they can count. Attach an inventory if you have one, even a rough one: number of workstations and their size, private offices, conference rooms, files and storage, breakrooms and equipment. Floor plans help. If there is no inventory, schedule a walkthrough window and say so in the RFP. A walkthrough also shows bidders the loading dock, the freight elevator and the route out of the building, which often matter more to the schedule than the furniture count.

Line items to price

LineWhat to specify
Furniture and cubiclesTeardown and removal, and how each category should be routed: resale, donation, recycling, kept, or moved to another site
Items keptWhat moves to another floor or building, and whether it is reinstalled
CablingWhether abandoned data and low-voltage cabling must be removed, and from where
FixturesWhiteboards, signage, TVs and mounts, shelving, wall-hung storage
IT and e-wasteWho wipes data, which equipment is leased or carrier-owned, and what certificates are required
Breakroom and appliancesRefrigerators, microwaves, vending and anything plumbed in
RestorationThe landlord's list: patching, paint, flooring, signage, any return to original condition
Final cleanBroom-swept, or a janitorial clean by someone else

Ask bidders to price each line separately and to list anything they exclude. Exclusions are where proposals that look similar turn out to be different.

Building rules

Ask the property manager for the building's contractor rules before the RFP goes out and attach them: dock and freight elevator hours, after-hours access, floor and wall protection, certificate of insurance requirements, parking for trucks, and any security, escort or badging requirements. Bidders who know the rules price them in. Bidders who do not, find them later.

Handback standard and documents

Define done. Most leases accept broom-swept with everything out, but some require more, so quote the surrender clause or attach it. Then list the documents you want at the end:

  • An itemized inventory of everything removed.
  • Photos of the empty space at handback.
  • A disposition record showing where furniture and electronics went.
  • Certificates of data destruction for recycled drives and storage devices.

Comparing the proposals

Put the proposals side by side, line by line. Check that each one covers the whole scope, that the schedule fits your date with room for an elevator delay or a surprise in the ceiling, and that the routing plan for furniture is specific rather than "disposal". Then check the handback documents promised. The guide to choosing an office decommissioning company lists the questions worth asking each bidder.

Public agencies add one step: the surplus process. Say in the RFP who approves the release of furniture and when, so bidders plan around that approval. See government office decommissioning in Arizona.

A one-page outline

  1. Project summary: site, floors, square footage, empty-by date, handback date.
  2. Inventory or walkthrough window, with floor plans attached.
  3. Line items to price, in the table order above, with exclusions listed.
  4. Routing rules: who approves resale, donation and recycling.
  5. Building rules, attached.
  6. Handback standard and required documents.
  7. Questions contact, question deadline and proposal due date.

Want a second opinion on a draft scope before it goes out? Send it to hello@officestation.com. For a project in the Valley, see how office decommissioning in Phoenix runs from walkthrough to handback. More background: what office decommissioning is, how long it takes and the decommissioning checklist.

Frequently asked questions

What should an office decommissioning RFP include?

The site and dates, an inventory or a walkthrough window, what happens to each category of furniture and equipment, cabling and fixture removal, IT and e-waste handling, restoration items from the lease, building rules, the handback standard and the documents required at the end. Each of those is a line bidders can price.

Should we require a site walkthrough before bids?

Yes, if you can. A scheduled walkthrough, or one window when every bidder can visit, gives everyone the same picture of the space, the loading dock and the elevators. Without one, bidders guess, and guesses show up as allowances and change orders later.

How do we compare proposals fairly?

Ask every bidder to price the same line items in the same order, and to say how each category of furniture will be routed. Then compare scope coverage, schedule, the disposition plan and the documents promised at handback, not only the total.

Who decides whether furniture is sold, donated or recycled?

The owner of the furniture. For a company that is usually facilities or finance. For a public agency it is the agency's surplus process. The RFP should say who approves routing and when, so the vendor plans around that approval.

What documents should we require at handback?

An itemized inventory, photos of the empty space, a disposition record showing where furniture and electronics went, and certificates of data destruction for recycled drives and storage devices. If you report landfill diversion, ask for the record in the format your report uses.

Start here

Request a free walkthrough

Tell us the address, what is in the space and the date it must be empty. A walkthrough is typically scheduled within 48 hours in Greater Phoenix, and a written recommendation follows.

  • Free walkthrough, no obligation
  • Written recommendation for every part of the inventory
  • Cleared and broom-clean by your date
Walkthrough request