
Office furniture liquidation in Energy Corridor
Corporate move-outs, consolidations and lease exits in Energy Corridor, planned around the district's buildings and logistics, starting with a free walkthrough.
Clearing an office in Energy Corridor
The Energy Corridor runs along I-10 (Katy Freeway) in west Houston, roughly from Kirkwood Road west past Eldridge Parkway to SH 6, next to the Addicks and Barker reservoirs. It is home to oil and gas producers, engineering and construction firms, and energy services companies, many in headquarters and regional campuses.
The stock is mostly suburban mid-rise and high-rise towers and corporate campuses from the 1980s onward, such as the Energy Center and Energy Tower buildings, plus large owner-built campuses along Eldridge Parkway. Most have parking garages, loading docks and freight elevators, so clear-outs hinge on dock scheduling and campus security rather than street access.
District snapshot: The Katy Freeway/Energy Corridor submarket led Houston with 488,979 square feet of net absorption in Q1 2026, bringing its direct vacancy down to 14.3%. Source
Recent Energy Corridor office activity, as reported
- DRB Group leased about 26,000 square feet at Energy Tower II in the Energy Corridor in Q1 2026. Source
Listed to illustrate market activity. These organizations are not Office Station clients unless stated.
Where we work in Energy Corridor
- I-10 Katy Freeway
- Eldridge Parkway
- SH 6
- Addicks Reservoir
- Terry Hershey Park
- Energy Center
ZIP codes include 77079, 77077, 77094.
Planning a Energy Corridor move-out
What experienced facilities teams account for in this district before the first desk comes apart.
- Coordinate with campus security on truck access and driver lists, since many Energy Corridor campuses control gates and loading areas.
- Schedule truck moves outside I-10 peak hours, when the Katy Freeway frontage roads and Eldridge Parkway back up.
- Plan large decommissions as floor-by-floor phases, since energy-sector consolidations often empty multiple floors of one tower.
- Build rain delays into the schedule during hurricane season, as heavy storms can flood roads near the reservoirs.
- Confirm garage height and dock dimensions before sending trucks, since many towers route all moves through one dock.
One project lead, start to handback
- Within days
Walkthrough
We walk the space, count and grade the inventory, note access, building rules and your lease date. Typically within 48 hours in Greater Phoenix.
- Within 5 business days
Written recommendation
Every office is different. We recommend the best route for your furniture, whether resale, a buy, a quote to clear, donation or recycling, or a mix, case by case.
- On your calendar
Schedule
Crews are booked around your move date, including nights and weekends when the building requires it.
- Removal day
Clear and decommission
Furniture, cabling, whiteboards and e-waste out, with building protection and dock scheduling handled.
- Handback
Documentation
Broom-clean space, photo walkthrough, certificates for e-waste and a diversion summary for your records.
Everything out, documented
- Free walkthrough and a recommended route, case by case
- Workstations, seating, casegoods and storage
- Cabling, whiteboards, signage and fixtures
- E-waste with certificates of data destruction
- COIs, freight elevators and dock scheduling
- Nights and weekends when buildings require it
- Itemized inventory and photo-documented handback
- Diversion summary for sustainability reporting
Energy Corridor liquidation FAQ
Do you liquidate office furniture in Energy Corridor?
Yes. Office Station provides corporate office furniture liquidation and decommissioning in Energy Corridor and across Houston, TX. After a free walkthrough we recommend the best route for your furniture, case by case, and clear on your lease deadline.
What should I plan for when moving out of a Energy Corridor office?
Coordinate with campus security on truck access and driver lists, since many Energy Corridor campuses control gates and loading areas. Schedule truck moves outside I-10 peak hours, when the Katy Freeway frontage roads and Eldridge Parkway back up.
How fast can you schedule a walkthrough in Energy Corridor?
Walkthroughs are typically scheduled within two to three business days, with a written recommendation within five business days.
What decides the route for office furniture in Energy Corridor?
Manufacturer, age, condition, matched quantities, building access and your timeline. Well-kept systems furniture in matching runs often suits resale, while mixed or worn pieces may be better suited to donation or recycling. The route is set out in writing after a walkthrough and inventory grading, before anything is scheduled.
More Houston sub-markets

Moving out of a Energy Corridor office?
Every office is different. After a free walkthrough we recommend the best route for your furniture, case by case, and clear on your lease deadline.